requestId:685d5492a629b9.86854376.
Recently, Xiangtan, Hunan published the “Xiangtan Urban Black and Smelling Water Management Exploration Plan (2018-2023)”. The full text is as follows:
Xiangtan Municipal Government Administration Office’s notice on the issuance of the “Xiangtan Urban Black and Smelling Water Management Exploration Plan (2018-2023)”
National Bureaus of various county municipal districts, Xiangtan High-tech Zone, Guandong District and Zhao The Management Committee of the Mountain Demonstration Zone, various units of the municipal agency, municipal and enterprises and institutions, and everyone is familiar with each other: The “Xiangtan City Urban Black and Smelling Water Management Battle Implementation Plan (2018-2023)” has been approved by the Municipal Nationwide Administration and is now printed and published. Please implement it in conjunction with actual seriousness.
Office of Xiangtan Municipal Government Bureau
February 14, 2019
(This document is actively publicized)
Xiangtan City Urban Black and Smelling Water Management Exposure Implementation Plan (2018-2023)
In order to deepen the management of black and odorous water in urban areas, establish trees and perfect long-term governance mechanisms, consolidate the results of basic management, and strive to win the black and odorous water management attack, according to the “Notice of the National Institute of Economic Affairs on the Prevention and Control Action Plan for the Purification of Water Release” (Sugar baby国大官网〔2015〕17), “Notice of the Ministry of Ecology and Environment of the Ministry of Housing and Urban-Rural Construction on the Implementation Plan for the Management of Black and Smelling Water in the City” (Jiancheng〔Escort2018〕104), “Hunan Province Housing and Urban-Rural Construction Hall Hunan Province Environmental Protection Hall Renewal Housing and Urban-Rural Construction Department Environmental Protection Department on the Imperial City Black Odor The notice of the guide to water remediation tasks” (Xiang Jiancheng Letter [2015] No. 249) and the “Hunan Housing and Urban-Rural Construction Hall Hunan Environmental Protection Hall on Accelerating the Promotion of the Black and Odor Water Remediation Task in the Union City of Our Province” (Xiang Jiancheng Letter [2017] No. 41) combine the Xiangtan International to prepare this plan.
1. Overall request
(I) guides thinking. Guided by the socialist thinking of Chinese characteristics in a new era, we deeply implement the party’s 19th and 19th National Committee of the Second and Third Central Committee of the Communist Party of China, and firmly establish the foundation./”>Sugar baby‘s “Economy is the first, green development” concept is to build the “Wild’s Old Country, the Great XiangtanSugar baby” is the goal, to fight a good battle to prevent and resolve serious risks and clean up prevention and control, implement the construction of maritime cities, highlight the direction of problem and target direction, adhere to the combination of management and prevention, strengthen the strict prevention of source, process management, serious damage, and responsibility investigation, and apply for 5 years, comprehensively adopt engineering and non-engineering measures. To fully promote the management of black and odorous water bodies in urban areas, strengthen and expand management results, establish a clear division of labor, responsibility and long-term management control mechanism that combines daily governance and professional maintenance, so as to avoid “returning black and odor”, and further improve the quality of the water environment in our city and improve the living environment.
(II) Mission Principles
1. Adhere to the principle of treating both the root causes and the near-distance combination. Adhere to the combination of treatment standards and the long-term goals and the near-term goals. It not only strictly follows the time points stipulated in the “Water Purification Prevention and Control Action Plan” to effectively eliminate black and odorous waters, but also accelerate by The construction of urban environment-based facilities and perfect long-term mechanisms can solve the related environmental problems that cause black and odor in water from the most basic level. We will not only focus on eliminating the fierce battle of black and odor in urban water, but also grasp the durable battle of “long-term governance and long-term cleanliness”.
2. Adhere to the principles of system management and step-by-step implementation. Comprehensive application laws, economy, technology and required actions Political skills, systematically promote projects such as clean management, flood control and discharge, and environmental protection. According to the needs of management tasks and financial gain, we can implement them step by step to affect the 7 black and smelly water bodies (Ailian Canal, Qiliguan, Nanyang Canal, Qiuziliwang Canal, Jianglu West Canal, Wanlong Canal, and Changcheng Township Second-level Canal, the same below) along the rain and sewage pipe network. The topic is the focus, and in accordance with the idea of ”dividing the difference, from near to far, doing as possible, and seeking truth from facts”, the reform of rainwater and sewage diversion is promoted in stages and steps and orderly, without taking the responsibility, and rushing to the point.
3. Adhere to the principle of local governance and departmental cooperation. The national government, park and demonstration zone management committees in each urban area are the responsible bodies of management and are responsible for the Implement a long-term governance system, consolidate and maintain management results. The Municipal Finance Bureau, Municipal Natural Resources and Planning Bureau, Municipal Ecological Environment Bureau, Municipal Housing and Urban Construction Bureau, Municipal Water Resources Bureau, Municipal Agricultural and Village Bureau, Municipal Urban Governance and Comprehensive Law Bureau and other units must perform their duties and actively carry out tasks such as coordination, policy guidance, fund guarantee, and supervision and inspection. p>
4. Adhere to the principle of whom and who manage it. In a step further, the responsibility of the bureau and enterprises, the bureau and the residents is improved. The bureau does not undertake the responsibility of the government and enterprises, and the government will be responsible for the management of the purification sources such as industrial enterprises, livestock and poultry breeding. The rain and sewage separation reform and the integratedization of small sewage treatment in enterprises, major universities, and self-sponsored hospitals.The construction of facilities is subject to the responsibility of each unit and resolved within a time limit.
5. Adhere to the principles of information disclosure and public participation. Announce the management situation to the public on a regular basis, receive public comments and supervision, and promptly handle public appeals from the public; guide and encourage the public market to support and participate in river management and protection through various situations, and cooperate with improving the ecological environment of rivers and lakes in the city.
2. Mission goals and implementation steps
(I) Mission goals. The basic management of 24 black and odorous water bodies in urban built areas will be completed by the end of 2018 to eliminate black and odorous water bodies will be realized, and the “long-term treatment and long-term cleaning” will be realized by the end of 2020, and the reform of rain and sewage diversion along the 7 black and odorous water bodies will be completed by the end of 2023.
(II) Implementation steps. It will be implemented in four stages, and 24 black and odorous water management will be completed by the end of 2020, achieving “long-term treatment and long-term cleaning”; starting and implementing the reform of rainwater and sewage diversion. All tasks to complete the reform of rainwater and sewage diversion from 2021 to the end of 2023.
The first stage (July-December 2018):
1. Start the survey on the rain and sewage diversion of 7 black and odorous water bodies along the line;
2. The management committees of the civil service bureaus, parks and demonstration areas of each urban area completed the survey of fragmented black and odorous water bodies and started basic management;
3. The “Regulations on the Management of Stable and Determination of Black and Odor Water in Urban Areas of Tan City” (Tan Zheng Office [2018] No. 41) will transfer 24 black and Odor Water bodies that have completed basic management to the local Nation Bureau, the park and the demonstration zone management committee for governance; 4. The water bodies that have completed basic management will be purchased through the bureau’s purchase service method and entrusted a professional company for maintenance.
Second Stage (2019):
Before the end of June, the comprehensive governance information system of the underground pipeline of Shuli is located. The local government bureaus, parks and demonstration zone management committees are responsible for the management of local govern TC: